KIGGENERGY LABS Start a conversation

ISO 55001 · Asset health indexing · Predictive maintenance

Know the condition, risk and true value of every electrical asset you own.

An end-to-end asset management programme for power utilities and electricity-intensive industry. Built on ISO 55001, CIGRE health indexing and on-site diagnostic testing, and delivered by engineers who test the equipment themselves.

ICT-2 · 315 MVA · 400/220 kVILLUSTRATIVE
34
Health index / 100Poor
Probability of failure
High
Consequence of failure
Very high
Dominant driver
C₂H₂ trend · Duval D1
Est. remaining life
4–7 years

Recommended: retest DGA in 30 days; budget replacement in the FY28 capex plan.

ICT-181
BR-40551
CT-220R46
LA-220-358
400/220 kVTransmission substation health index model, South India
40 substationsTechnical inspection at 110 kV and 35 kV, Central Asia
110/27.5 kVRailway traction substation engagement
NABLAccredited testing laboratory in-house
Since 2000Designing relay, meter and CT/PT test equipment

The problem

Depreciation tells you what an asset cost. It cannot tell you what it is worth, or how close it is to failing.

Book value is not condition

A 25-year-old transformer can be fully depreciated and still have years of service left, or be one through-fault from failure. Straight-line depreciation cannot tell the two apart.

Calendar maintenance spends in the wrong places

Time-based schedules give a healthy breaker and a failing one the same attention. Crews and shutdown windows go where the calendar says, not where the risk is.

Capex justified on age alone

Replacement plans built on nameplate age are hard to defend before a board or a regulator, and they miss the young assets that are already degrading.

An unplanned failure of a large power transformer means a replacement measured in crores and a lead time measured in months. Knowing which unit is next is worth more than either.

Model it for your fleet

The programme

One programme, from ISO 55001 gap assessment to the investment decision.

Start at any stage. Each one stands on its own and feeds the next, so the asset register, the test results and the health index stay one consistent picture of your fleet.

  1. 01 Assess
  2. 02 Register
  3. 03 Test
  4. 04 Index
  5. 05 Monitor
  6. 06 Decide
  7. 07 Certify
01 · ASSESS

ISO 55001 gap assessment and maturity baseline

A clause-by-clause gap assessment against ISO 55001:2024 and a maturity score across the IAM's 39 asset management subjects. You get a prioritised roadmap, not a binder.

ISO 55001:2024 · ISO 55002 · IAM Anatomy
02 · REGISTER

Asset register and criticality

A clean, CIM-aligned register for every asset class, with each asset ranked by the consequence of its failure on safety, supply, environment and cost.

IEC 61968 / 61970 CIM · criticality matrix
03 · TEST

Condition assessment campaigns

Shutdown-aligned diagnostics: DGA and oil quality, tan δ and capacitance, SFRA, partial discharge, breaker timing and contact resistance, and thermography, backed by KIGG's NABL-accredited lab.

IEC 60599 · IEC 60076-18 · IEC 60270
04 · INDEX

Asset health index and risk

Health indices built on CIGRE methods, combined with consequence of failure into a risk ranking. Thermal ageing per IEC 60076-7 gives a remaining-life estimate you can audit line by line.

CIGRE TB 858 · TB 761 · IEC 60076-7
05 · MONITOR

Online monitoring and digital twin

Online sensing only on the assets that justify it, feeding a substation digital twin with physics-gated anomaly detection. Alerts arrive with a probable cause, not just a threshold breach.

IEC 61850 · IEC 60870-5-104
06 · DECIDE

Investment planning and asset valuation

Repair, refurbish or replace decisions ranked by risk reduced per rupee spent. A condition-based view of asset value gives Finance a defensible alternative to straight-line depreciation.

Risk-based capex · lifecycle cost
07 · CERTIFY

ISO 55001 certification readiness

A documented asset management system, internal audits and a pre-assessment, so you walk into the certification audit ready. Certification itself is issued by an accredited certification body.

ISO 55001:2024 · internal audit

How it works

Baseline once. Keep the picture current every year.

1

We baseline

The gap assessment, the register and a first test campaign establish where every asset stands today.

2

We index and rank

Every asset gets a health index, a probability of failure and a consequence score. The risk ranking shows where the next rupee should go.

3

We stay on

An annual programme of repeat campaigns, online monitoring where justified and a twin that updates with every test, so the index never goes stale.

Health indexing

Every asset, one defensible number.

Each index is built from measured condition, weighted by asset class and traceable to the test that produced it. Engineering sees what to fix; Finance sees what the fleet is worth.

  • Health index from 0 to 100, in five condition bands
  • Probability and consequence of failure on one risk matrix
  • The dominant driver behind every score, with the evidence
  • A recommended action and the year it belongs in the plan

Sample 400/220 kV substation

ILLUSTRATIVE DATA
ASSETHEALTHDRIVERRISK
ICT-2315 MVA 400/220 kV ICT34C₂H₂ trend, Duval D1Critical
CT-220-B7R220 kV CT, bay 7, R-phase46tan δ 0.4% → 0.9%High
BR-405400 kV SF₆ breaker51Close time +4 msModerate
LA-220-3220 kV surge arrester58Resistive leakage upModerate
ICT-1315 MVA 400/220 kV ICT81NoneLow

Asset classes

Every asset class in the substation and the plant.

  • Power transformers and reactors
  • Instrument transformers: CT, PT, CVT
  • Circuit breakers
  • Gas-insulated switchgear
  • Isolators and earth switches
  • Surge arresters
  • HV and MV cables
  • Protection relays and schemes
  • Batteries and DC systems
  • MV switchgear
  • HV and MV motors
  • Earthing systems

Instrument transformers are where KIGG started: two decades of building the CT and PT test benches that utilities and manufacturers use to verify them.

Industries

For operators who cannot afford to lose an asset.

Transmission utilities

400, 220 and 132 kV substations, ICTs and line bays. Risk-ranked capex the regulator can follow.

Distribution utilities

33/11 kV substations and distribution transformer fleets, prioritised by health and consequence.

Generation

Generator and station transformers and HV auxiliaries, where an outage means lost generation.

Railway traction

Traction substations from 110 kV to 220 kV, where a transformer outage stops trains.

Steel and aluminium

Rectifier and furnace transformers, potline and mill supplies under continuous heavy duty.

Chlor-alkali and chemicals

Rectifier transformers and HV motors on processes that cannot stop without loss.

Cement and mining

HV motors, MV switchgear and kiln-critical drives in dusty, high-temperature duty.

Data centres

The electrical chain from HV intake to UPS behind every uptime commitment.

Field record

Work in live substations, not slideware.

STATE TRANSMISSION UTILITY · SOUTH INDIA

Health index model for a 400/220 kV substation

Asset health scoring built on CIGRE TB 858 and TB 761, aligned with the utility's own maintenance checklists.

NATIONAL GRID OPERATOR · CENTRAL ASIA

Technical inspection of 40 substations

Condition inspection across 33 substations at 110 kV and 7 at 35 kV.

RAILWAY OPERATOR · WEST COAST, INDIA

110/27.5 kV traction substation

Engagement at a railway traction substation, where a transformer outage stops trains.

Why KIGG

Engineers who test, not analysts who guess.

We test the equipment ourselves

KIGG has built relay, energy-meter and CT/PT test equipment for over two decades and runs an NABL-accredited lab. The index rests on measurements we take and can defend.

Every score is auditable

Each index traces to a measurement, a published standard and a weighting your engineers can inspect. No black-box scores.

Engineering and Finance on one page

The model that ranks maintenance also gives Finance a condition-based view of asset value and remaining life.

Deploys inside your network

On-premise or private cloud, behind your OT DMZ, speaking IEC 61850 and IEC 60870-5-104 to the systems you already run.

Start with one substation or one plant.

A fixed-scope ISO 55001 gap assessment and health index baseline on a single site. You see the method on your own assets before you commit to a programme.

Start a conversation

+91 98208 30550 · contact@kiggenergylabs.com